the Kitsilano bike freeway

October 30, 2013

Some critics of the park board plan [1] have called the infamously bike path approved by the park board, a “bike freeway”. Is it an “over the top” rethoric”?

A freeway definition:

freeway
/ˈfriːweɪ/
nounN. AMER.
dual-carriageway, especially one with controlled access.

The park board plan for the bike lane:
kitsBikeLanePicnicArea

The dual carriageway is there, albeit on a short section, where downhill bikes can accumulate lot of speed (the reason for the “freeway”?). That is a point for the bike freeway qualification. Unfortunately it is also at the most convoited picnic area site…If the project proceeds ahead, picnickers will be separated from the shore by no less than 3 rows of paths…The bike path takes more space than we have initialed thought


Notice, that the gradient of the slope is roughly similar to the one on McNicoll, but the elevation difference, 6m, is 50% greater than between arbutus and Maple, along Mc Nicoll (4m). That increases the risk of speedy cyclists, and potential safety hazard


Notice also, that from a cycling effort perspective, it makes little sense, to go down to the parking lot from Arbutus (2m elevation change), to have a longer hill.

The route above is extracted from the RFP No. PS20130532, providing detailled engineering plans: this finding call for a recap of the Kits beach bike lane saga


  • On october 7th, the Park board approves a bike lane bisecting Kistilano beach and Hadden parks, the approved report [1] mentions that benches need to be relocated, and fences erected around the playground area (see more here)
  • On october 14th, thanks to some chalk lines materializing the approved bike route alignment, park users and residents discover the existence of the project. That creates an outrage in the community, Howard Kesley seems to emerge as a leader, and seems to be behind @savekitsbeach and the associated facebook page (Raymond Tomlin, is also following this on his blog Vanramblings)
  • On october 15th, Park board commissioner Aaron Jasper explains it is a “done deal”, and there is no intention to consult the public on it [3]
  • On october 16th, The city of Vancouver issues the request for proposal PS20130532, with detailled engineering plan – specifying at least 5 memorial benches to be relocated, in addition of picnic tables, and the fencing of the playground area. the deadline is November 5th
  • On october 18th, Park board chair Sarah Blyth issues a media release [2] qualifying as “untrue rumour” the above and stating that the “White chalk lines outlining a wide route through the Park” as not in any way reflect the route to be taken”. The park board staff said otherwise the day before. She goes as far as to say that “The final route has not been determined”, and advisory group will be established to work on the final design of the route. Some media, like the Georgia Straight, reprint the media releases in extenso without pointing any contradictions
  • On october 20th, a town hall meeting organized by savekitsbeach is held at the Kitsilano boat house. NPA park board commissioners Melissa De Genova and John Coupar, NPA city Cuuncillor George Affleck and Vision park board commissioner Constance Barnes are attending. Ms Barnes then recognizes than the lack of public consultation was a mistake, explained the the park board has been misleaded by its staff, and agreed to correct that…
  • On october 22th, Park board chair Sarah Blyth and commissioner Constance Barnes agree finally to qualify the attendance to the sunday town hall meeting, as a “mob of retiree loitering around the Boathouse” and “enjoying obsolete pasttime…as picnicking” [4].
  • On october 28th, NPA Park board John Coupar and Melissa De Genova issued a motion calling for Special Meeting on Kits Beach Park, to be held on Novemebr 4th, 2013, 6pm

In principle, After all the damages inflicted to the public trust, by more noticeabily park board commissioners Barnes and Blyth, the park board, recognizing it has been off track, should be eager to regain this trust and approves the NPA motion…and finally forms the promised advisory committee….

…let see how gonna unfold all this….


[1] Seaside Greenway Improvements,Vancouver Park Board, Oct 1st, 2013

[2] Park Board statement on Hadden and Kitsilano Beach Bike Path – Next Steps, Sarah Blyth, October 18th, 2013

[3] Kits Beach bike path a done deal, Sandra Thomas, Vancouver Courier – October 15, 2013

[4] See various tweet from the concerned indviduals: as here and there for Constance Barnes. Sarah Blyth did the same.

Advertisements

One Response to “the Kitsilano bike freeway”


  1. Notice also, that from a cycling effort perspective, it makes little sense, to go down to the parking lot from Arbutus (2m elevation change), to have a longer hill.


Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s

%d bloggers like this: